{"schemaVersion":"1.0","exportedAt":"2026-05-15T12:38:10.373Z","occupation":{"soc":"47-4099.00","title":"Construction and Related Workers, All Other","group":"Construction & Extraction","sector":"23","jobZone":2,"jobZoneInferred":true},"framework":{"version":"v.26.05","description":"","contextCovered":"This framework covers residential and light-commercial construction environments where workers progress from following basic site protocols to leading multi-project workforce and safety operations.","levels":{"emerging":{"label":"Emerging","statements":["Blueprint basics — identify key symbols and dimensions under direct supervision on an active construction site.","Site safety rules — recognize and follow posted safety protocols when inspecting work areas as a new crew member.","Hand tools and basic equipment — select and use correctly under foreman direction during routine construction tasks.","Work assignments — receive and carry out clearly defined tasks based on written or verbal instructions from a supervisor.","Progress checklists — complete basic inspection forms to document work status under close oversight on a job site.","Active listening skills — attend to and repeat back verbal instructions from lead workers to confirm understanding of daily tasks.","Spreadsheet software — enter basic construction data into pre-built templates under guidance from office or site staff.","Material quantities — count and tally supplies on hand using simple arithmetic to support crew preparation activities.","Safety hazards — report observed equipment malfunctions or site dangers immediately to a supervisor during daily walkthroughs.","Email software — send and receive routine job-site communications with supporting staff under administrative direction."]},"developing":{"label":"Developing","statements":["Construction specifications — read and interpret blueprint details independently to determine sequencing of routine building tasks on a mid-size project.","Site inspections — conduct scheduled progress checks against specification requirements with minimal supervision on residential or light-commercial job sites.","Equipment monitoring — observe and log the operational status of site machinery during shift operations to flag early signs of malfunction.","Work scheduling — coordinate daily task sequences for a small crew by matching worker skills to material and job requirements.","Safety compliance — apply public safety and OSHA guidelines consistently when evaluating site conditions during routine inspections.","Document management software — organize and retrieve project files, inspection records, and change orders within a shared digital system.","Problem identification — recognize when a construction process deviates from spec and escalate findings to a project lead with supporting documentation.","Verbal communication — convey task expectations and progress updates clearly to crew members and subcontractors during morning briefings.","Measurement and math — calculate material dimensions and quantities from blueprints to verify correct material orders for upcoming phases.","CAD software basics — view and navigate digital construction drawings to confirm design details before beginning field installation work."]},"proficient":{"label":"Proficient","statements":["Full-scope site inspection — conduct thorough safety and quality inspections across all construction phases autonomously, referencing blueprints and specifications to verify compliance.","Specification interpretation — analyze complex blueprints and project documents independently to plan procedures and resolve design conflicts in the field.","Crew coordination — schedule and coordinate the concurrent activities of multiple construction workers across overlapping trades on a mid-size project.","Work assignment optimization — assign tasks to crew members by evaluating individual skill levels, material availability, and project deadlines without supervisory input.","Non-routine problem solving — apply critical thinking and field judgment to diagnose and resolve unexpected structural or procedural issues during active construction.","Operations control — monitor and adjust equipment performance parameters in real time during complex construction operations to maintain productivity and safety.","Spreadsheet and reporting tools — build and maintain project tracking spreadsheets to monitor labor, materials, and schedule adherence across a construction job.","Stakeholder communication — present project status, safety findings, and schedule changes clearly to owners or inspectors using office suite and presentation software.","Design knowledge application — evaluate proposed construction methods against design intent and mechanical requirements to recommend field modifications when needed.","Customer and service coordination — manage day-to-day interactions with property owners or clients to address concerns and align construction activities with expectations."]},"advanced":{"label":"Advanced","statements":["Organizational safety standards — establish and enforce site inspection protocols and safety compliance frameworks across multiple concurrent construction projects.","Strategic workforce planning — design crew assignment systems and staffing models that align worker capabilities with long-range project pipelines at organizational scale.","Mentorship and skills development — coach emerging and developing workers in blueprint reading, site inspection, and equipment monitoring through structured on-the-job programs.","Multi-project schedule oversight — direct the coordination and sequencing of construction activities across several job sites simultaneously to meet portfolio-level deadlines.","Policy and procedure authorship — develop written standard operating procedures for site inspections, equipment checks, and specification compliance used company-wide.","Technology adoption leadership — evaluate and implement CAD, document management, and field reporting software solutions to improve project efficiency across the organization.","Executive stakeholder communication — present construction performance metrics, safety outcomes, and resource needs to senior leadership and external clients using data-driven presentations.","Risk and judgment governance — establish decision-making criteria for field supervisors to resolve non-routine safety and compliance issues consistently across all projects.","Cross-functional coordination — align construction, administrative, procurement, and design teams around unified project goals through structured communication and management systems.","Continuous improvement leadership — analyze patterns in site inspection findings and crew performance data to drive systemic quality and safety improvements across the business."]}}},"sources":{"onet":"v30.2 (CC BY 4.0)","crosswalk":"https://skillscrosswalk.com","generator":"LER.me"},"attribution":"© EBSCOed"}